Office Remodel
We removed the walls to open it up
Here we moved the counter
and removed the walls to open it up
Bathroom Remodel, moved the hot water heater to a tankless unit outside
replaced the sub floor & made a shower curtain wall above
Complete kitchen remedel, torn back to the studs and rebuilt
We ripped up the linolium and put in a new sub floor, added electrical as needed
installed moisture resistant green board
Patched the old vent hole
Had a plasterer come in and put a smooth slury over all
The cabinets were installed
We painted and the flooring and counter tops were in stalled