Office Remodel

We removed the walls to open it up




Here we moved the counter

and removed the walls to open it up




Bathroom Remodel, moved the hot water heater to a tankless unit outside

replaced the sub floor & made a shower curtain wall above



      


Complete kitchen remedel, torn back to the studs and rebuilt

We ripped up the linolium and put in a new sub floor, added electrical as needed

installed moisture resistant green board

Patched the old vent hole

Had a plasterer come in and put a smooth slury over all

The cabinets were installed

We painted and the flooring and counter tops were in stalled