C.M.R. Enterprise
Last Updated: March 1, 2012

Return to the home page


Complete kitchen remedel, torn back to the studs and replaced

We ripped up the linolium and put in a new sub floor, added electrical as needed

installed moisture resistant green board

Patched the old vent hole

Had a plasterer come in and put a smooth slury over all

The cabinets were installed

We painted and the flooring and counter tops were in stalled

















Return to the home page